Godstone Farm

Commercial

We started at the origin of the installation and worked with UKPN to bring in there own private supply transformer and gave them the 315 Amp TP/N Supply. Along with this we designed and installed a bespoke MCCB Panel and distributed a 3 phase network around the site with an automated transfer switch to allow for a backup generator to run the site in the event of a supply failure. We also installed digital metering on all sub mains to provide real time energy management information to monitor current usage through out the site.